LEGOLAND® Florida
CES performed the mechanical design build responsibilities for the renovation and redesign of the 25 existing buildings and design assist responsibilities for the new exp, inc. designed buildings.
The fasttrack LEGOLAND® Florida project was delivered from inception to design and construction to grand opening in a mere 15 months.
Warner Jones, was CES's Design Build Manager on the LEGOLAND® of Florida project. Warner brings to CES a vast technical and practical knowledge in project installation and management experience in the theme parks, commercial, industrial, healthcare, education, and hospitality markets.
The park, which occupies the former Cypress Gardens site in Winter Haven, Florida, includes the construction of the following:
- 46 new rides, shows, buildings and attractions;
- the renovation of 25 existing structures;
- the installation of new infrastructure;
- upgrades of existing infrastructure; extensive hardscape, and landscape installation and historic tree relocation and restoration.
Design-build is an integrated approach that delivers design and construction services under one contract with a single point of responsibility. Owners select design-build to achieve best value while meeting schedule, cost and quality goals.
The Design Build Institue of America (DBIA) is committed to celebrating people and projects that raise the bar and demonstrate what Design-Build Done Right can achieve. DBIA is the only organization that defines, teaches and promotes best practices in design-build.
#TBT 2010 CES wins 2010 ABC Eagle Awards for HVAC & PLBG -The Wizarding World of Harry Potter™
CES Design-Build Mechanical Construction and Pre-Construction Services