195-ton Chiller replacement atop Doubletree’s 200’ tall resort tower a success

Doubletree by Hilton Orlando Sea World retained CES to perform an air-cooled chiller replacement at their International Drive resort. The project required installing a 14,000 lb, 195-ton chiller onto the rooftop of the 16 story, 200 ft. tall, 194k sq. ft. resort tower. CES partnered with Sims Crane Orlando to provide a 350-ton crane to accomplish the lift. The project required significant coordination between CES and resort staff to assure a safe project. The goals of the chiller replacement project were to reduce maintenance and energy costs and to improve reliability and efficiency.

Recent News Posts

Follow CES News Blog

Message from the President

Todd S. Morgan, P.E., President of CES

Todd S. Morgan, P.E., President

"Our professional services are the benchmark for quality and innovation. These long-standing commitments translate into CES’s formula for success. We are relationship based and performance driven. Our capabilities are unique and unmatched in our industry, we are a value provider for ensuring comfortable, efficient and healthy indoor environments."
TSM Signature
Todd S. Morgan, P.E.
President

 

Recent Community Posts